Home
Projects
Contact Us
Home
Projects
Contact Us
More
  • Home
  • Projects
  • Contact Us
  • Home
  • Projects
  • Contact Us

PROJECTS

We are committed to reaching all project goals, making sure all our services are performed in a professional matter and in accordance with the strictest quality standards established by the Engineering Practice and the Construction Industry. 


Here are some of the most recent projects where we have been involved as an example of our specialized services:  ' 

Hospital Menonita Caguas - Cogeneration Project - On-going

Hospital Menonita Caguas - New Well Water Storage & Treatment Facilities - On-going

Hospital Menonita Caguas -ICU + Rehabilitation Remodeling of Menonita’s 4th Floor - On-going

Hospital Menonita Caguas - Medical Offices Remodeling Project -

 On-going


Hospital Perea Mayaguez - Pediatrics - On-going

Hospital Perea Mayaguez - Medicina Sur - On-going

Hospital Perea Mayaguez - Imaging and Wome's Institute - On-going

Earthquake Damages Repair Program – Hospital Metropolitano Dr. Pila - On-going

Earthquake Damages Repair Program – Hospital Pavia Yauco - Ongoing

Migrant Health Center – Betances Clinic - Pre-construction

Hospital Metropolitano San Germán: ER Expansion and MRI Facilities - Completed: 2015

Hospital Doctor Pila: Emergency Department Expansion, Ponce     Construction - Completed:   2014

Hospital Doctor Pila: Emergency Department Expansion, Ponce     Construction -   Completed: 2014

Hospital Perea: Medical Facilities Expansion Building, Mayagüez    Construction - Completed:   2015

First Medical facilities - Hospital Metropolitano San Germán - Ongoing

Hospital Perea: New ICU - Ongoing

Gas Natural Fenosa Loading Facilities - Completed: 2017 

Metro Pavía Clinic Aguadilla: New Medical Facilities & Parking Structure Construction - Completed: 2016

Metro Pavía Clinic Aguadilla: New Medical Facilities & Parking Structure Construction - Completed: 2016

Hospital Metropolitano Yauco: New Boiler System - Completed: 2017

Hospital Doctor Pila: Catheterization Lab, Ponce     Construction - Completed:   2015 

Hospital Perea: La Palma Medical Offices & Kitchen Retrofit, Mayagüez    Construction - Completed:   2016 

Hospital Metropolitano San Germán: New LDR’s & Chiller Addition  Construction - Completed:   2016 

Hospital Perea: ER, Nursery & LDR, ICU Retrofit, Mayagüez - Completed: 2017

CONSTRUCTION MANAGEMENT AND INSPECTION

Cogeneration Project

 The Cogeneration Project, a CHP Solution (Combine Heat & Power), at the Hospital Menonita Caguas is under its final construction phase. The Hospital will be capable to produce their own energy to fulfill the power demand, also producing its own water heating and cooling for their existing systems. PREPA will be back-up for the power supply. CBE is proud to be part of this groundbreaking energy efficient project. 

Well Water Storage & Treatment Facilities

 The new well water storage and treatment plant project connects two existing wells with a new 120,000-gals bolted tank. The proposed water treatment system is reverse osmosis with multimedia filter. With the water treatment plant and cogeneration projects the Hospital will be fully resilient and independent from the government utility services. 

ICU + Rehabilitation Remodeling of Menonita’s 4th Floor

 The Hospital Menonita Caguas is in the construction process of the new ICU and Rehabilitation facilities on the fourth floor of the Hospital. Is a new 23,275 ft2 of interior liuarea dedicated to 12 intensive care rooms, three of them isolation rooms, and its supports area, 16 rehabilitation rooms, two of them semi-private, its supports areas and a full GYM.  

Medical Offices Remodeling Project

The Medical Offices project consists in the refurbishing     of three abandoned buildings annexed to the Hospital Menonita Caguas, 33,020 sq ft. of construction, 20 new     medical offices, 55 examination rooms with new electrical,     telecommunications, fire alarm, HVAC, fire sprinkler, and plumbing systems.     

                                       

Hospital Perea - Improvements to “Medicina Sur” & Pediatrics

The     “Medicina Sur” & Pediatrics Project consists in the remodeling of two     floors at the Hospital Perea in Mayagüez, 6,000 sq ft area. “Medicina Sur”, eight     private nursing rooms and six pediatrics rooms both floors with their     supporting services areas. 

Perea Imaging & Women’s Institute

The Perea Imaging and Women’s Institute project consists of the refurbishing of the first floor of the Perea Imaging Building, 3,800 sq. ft. of construction area. The proposed services are: two sonography’s, densitometry, stereotactic mammography, mammography, X-rays, MRI, CT Scan, three waiting rooms and supporting areas.   

Perea Imaging & Women’s Institute

The Perea Imaging and Women’s Institute project consists of the refurbishing of the first floor of the Perea Imaging Building, 3,800 sq. ft. of construction area. The proposed services are: two sonography’s, densitometry, stereotactic mammography, mammography, X-rays, MRI, CT Scan, three waiting rooms and supporting areas.   

Earthquake Damages Repair Program – Hospital Metropolitano Dr. Pila

The Hospital Metropolitano Dr. Pila Earthquake Damages Repair Program is the emergency response to repair all damages caused by the seismic events in the south of Puerto Rico in order to continue giving the health services in a timely manner. The project consists in the repair of all systems: structural, architectural, mechanical, and electrical. 

Earthquake Damages Repair Program – Hospital Pavia Yauco

 The Hospital Pavia Yauco Earthquake Damages Repair Program is the emergency response to repair all damages caused by the seismic events in the south of Puerto Rico in order to continue giving the health services in a timely manner. The project consists in the repair of all systems: structural, architectural, mechanical, and electrical. 

Migrant Health Center – Betances Clinic

The Migrant Health Center, Betances Clinic II project in Mayaguez consist in a new three-story building, 40,000 sq ft of new construction, sitework, new substation, power generator, and electromechanical building, including water cistern. The building will accommodate administration offices, urgency department, laboratory, medical offices, dental services and imaging department. 

Other Construction Management and Inspection Projects:

Hospital Perea, Mayagüez: New Pharmacy

  • Completed:  2019

Hospital Perea, Mayagüez: Emergency Dept., Nursery & LDR, ICU Retrofit

  • Completed:  2019

Kmart: 7768 Store Remodeling, Guaynabo

  • Completed:  2017

Metro Pavía Clinic Aguadilla: New Medical Facilities & Parking

  • Completed:  2016

Hospital Metropolitano San Germán: New LDR’s & Chiller Addition

  • Completed:  2016.

Hospital Perea: La Palma Medical Offices & Kitchen Retrofit, Mayagüez

  • Completed:  2016.

Hospital Perea: Medical Facilities Expansion Building, Mayagüez

  • Completed: 2015.

Hospital Doctor Pila: Catheterization Lab, Ponce

  • Completed: 2015

Hospital Metropolitano San Germán: Emergency Department Expansion & MRI Facilities

  • Completed: 2014

Hospital Doctor Pila: Emergency Department Expansion, Ponce

  • Completed: 2014

Structural Engineering Projects

Each design project is executed responsibly, we emphasize on the compliance with the applicable Construction Codes, the on-time design completion and creative structural solutions. Some of our projects are: 

Doctor’s Center Hospital: Specialized Medicine Clinic, Carolina – Structural Analysis & Design

Structural evaluation of the existing one-story, structural retrofit & design, Concrete Structure. 

On-going 

Doctor’s Center Hospital: Women’s Institute, Bayamón – Structural Design

Structural design of the proposed expansion to the one-story building, Concrete Structure. 

On-going  

Menonita Cayey Medical Center: New Diesel Tank Facilities – Structural Design

Structural design of the proposed concrete pad and retaining wall for the new diesel tank.

On-going 

AES Guayama: New HVAC System – Structural Design

Structural design of the proposed concrete pads and structural steel platforms for the new A/C units and ductwork. 

On-going 

Doctor’s Center Hospital, Santurce: Parking Building Structural Evaluation

Structural evaluation of the parking building concrete slab oxidation problem.

Completed 2019 

Cost U Less: Curacao, Grand Cayman, and St. Thomas Stores: Steel Building Structural Assessment

Structural assessment and evaluation of the existing structural steel buildings after Hurricanes Irma & María. 

Completed 2019 

Costa Bahia Hotel, Paseo Caribe, San Juan: Structural Evaluation & Design

Structural Design for the Ocean Launch Terrace, Structural Steel and Glazing and Evaluation of existing structure. 

Completed 2019 

Forensic Science Institute of Puerto Rico, San Juan: Structural Design

Structural Design for the new air-cooled water chiller platforms – Structural Steel for Trane Puerto Rico. 

Completed 2019 

Mayaguez Mall New Façade: Structural Design

Structural Design for the new Mayaguez Mall Entrances – Structural Steel. 

Completed 2019.  

Kmart St. Croix: Structural Design

Structural Design for the new HVAC System Platform – Structural Steel. Completed 2018.   

Ponce Hilton: New Skylight Structural Inspection

Structural Inspection for the installation of the new skylight – Structural Certification. Completed 2018 

Hospital Metropolitano Dr. Susoni: Structural Steel Columns and Beams Repair

Structural Design for the columns and beams repair, Oxidation problem, Repair works Supervision and Certification Completed 2018 .

BPPR: Popular Auto New facilities, Isla Verde

Structural Design, Structural Steel. Completed 2017.

Hospital San Francisco: Emergency Department Expansion, Rio Piedras – Structural

Structural construction documents for the new one-story expansion concrete building. 

Construction Cost: $500,000.00. Completed 2015 

Hospital San Carlos Borromeo, Moca: Interior Retrofit – Structural Design

Structural construction documents for the interior building retrofit. Structural steel.

Completed 2014 

Hospital Pavía Santurce – Structural Analysis

Structural as-builts drawings and structural analysis of the health facility complex composed by four buildings connected together. Concrete and structural steel. Completed 2014 

Hospital Dr. Susoni: Pedestrian Bridge & Drop-off, Arecibo – Structural Design

Structural Design for the Pedestrian Bridge Retrofit and the New Drop-off Facility. Structural Steel. 

Completed 2014 

Marina Guest House, Ponce – Structural Design, Permits & Project Supervision

The “for construction” drawings set, construction permits procurement and project supervision. 

Concrete & Wood Structural Retrofit. Completed 2014.  

Hospital San Carlos Borromeo, Moca – Structural Analysis

Structural analysis of the concrete building for the evaluation of cracks on structural elements.

Completed 2014.

Surf &Fun Water Park, San Germán – Structural Analysis

Structural analysis of the Flow Rider “as-built” condition, structural steel. 

Completed 2014. 

Copyright © 2023 CB Engineering, LLC. - All Rights Reserved.


Powered by GoDaddy