The Cogeneration Project, a CHP Solution (Combine Heat & Power), at the Hospital Menonita Caguas is under its final construction phase. The Hospital will be capable to produce their own energy to fulfill the power demand, also producing its own water heating and cooling for their existing systems. PREPA will be back-up for the power supply. CBE is proud to be part of this groundbreaking energy efficient project.
The new well water storage and treatment plant project connects two existing wells with a new 120,000-gals bolted tank. The proposed water treatment system is reverse osmosis with multimedia filter. With the water treatment plant and cogeneration projects the Hospital will be fully resilient and independent from the government utility services.
The Hospital Menonita Caguas is in the construction process of the new ICU and Rehabilitation facilities on the fourth floor of the Hospital. Is a new 23,275 ft2 of interior liuarea dedicated to 12 intensive care rooms, three of them isolation rooms, and its supports area, 16 rehabilitation rooms, two of them semi-private, its supports areas and a full GYM.
The Medical Offices project consists in the refurbishing of three abandoned buildings annexed to the Hospital Menonita Caguas, 33,020 sq ft. of construction, 20 new medical offices, 55 examination rooms with new electrical, telecommunications, fire alarm, HVAC, fire sprinkler, and plumbing systems.
The “Medicina Sur” & Pediatrics Project consists in the remodeling of two floors at the Hospital Perea in Mayagüez, 6,000 sq ft area. “Medicina Sur”, eight private nursing rooms and six pediatrics rooms both floors with their supporting services areas.
The Perea Imaging and Women’s Institute project consists of the refurbishing of the first floor of the Perea Imaging Building, 3,800 sq. ft. of construction area. The proposed services are: two sonography’s, densitometry, stereotactic mammography, mammography, X-rays, MRI, CT Scan, three waiting rooms and supporting areas.
The Perea Imaging and Women’s Institute project consists of the refurbishing of the first floor of the Perea Imaging Building, 3,800 sq. ft. of construction area. The proposed services are: two sonography’s, densitometry, stereotactic mammography, mammography, X-rays, MRI, CT Scan, three waiting rooms and supporting areas.
The Hospital Metropolitano Dr. Pila Earthquake Damages Repair Program is the emergency response to repair all damages caused by the seismic events in the south of Puerto Rico in order to continue giving the health services in a timely manner. The project consists in the repair of all systems: structural, architectural, mechanical, and electrical.
The Hospital Pavia Yauco Earthquake Damages Repair Program is the emergency response to repair all damages caused by the seismic events in the south of Puerto Rico in order to continue giving the health services in a timely manner. The project consists in the repair of all systems: structural, architectural, mechanical, and electrical.
The Migrant Health Center, Betances Clinic II project in Mayaguez consist in a new three-story building, 40,000 sq ft of new construction, sitework, new substation, power generator, and electromechanical building, including water cistern. The building will accommodate administration offices, urgency department, laboratory, medical offices, dental services and imaging department.
Each design project is executed responsibly, we emphasize on the compliance with the applicable Construction Codes, the on-time design completion and creative structural solutions. Some of our projects are:
Structural evaluation of the existing one-story, structural retrofit & design, Concrete Structure.
On-going
Structural design of the proposed expansion to the one-story building, Concrete Structure.
On-going
Structural design of the proposed concrete pad and retaining wall for the new diesel tank.
On-going
Structural design of the proposed concrete pads and structural steel platforms for the new A/C units and ductwork.
On-going
Structural evaluation of the parking building concrete slab oxidation problem.
Completed 2019
Structural assessment and evaluation of the existing structural steel buildings after Hurricanes Irma & María.
Completed 2019
Structural Design for the Ocean Launch Terrace, Structural Steel and Glazing and Evaluation of existing structure.
Completed 2019
Structural Design for the new air-cooled water chiller platforms – Structural Steel for Trane Puerto Rico.
Completed 2019
Structural Design for the new Mayaguez Mall Entrances – Structural Steel.
Completed 2019.
Structural Design for the new HVAC System Platform – Structural Steel. Completed 2018.
Structural Inspection for the installation of the new skylight – Structural Certification. Completed 2018
Structural Design for the columns and beams repair, Oxidation problem, Repair works Supervision and Certification Completed 2018 .
Structural Design, Structural Steel. Completed 2017.
Structural construction documents for the new one-story expansion concrete building.
Construction Cost: $500,000.00. Completed 2015
Structural construction documents for the interior building retrofit. Structural steel.
Completed 2014
Structural as-builts drawings and structural analysis of the health facility complex composed by four buildings connected together. Concrete and structural steel. Completed 2014
Structural Design for the Pedestrian Bridge Retrofit and the New Drop-off Facility. Structural Steel.
Completed 2014
The “for construction” drawings set, construction permits procurement and project supervision.
Concrete & Wood Structural Retrofit. Completed 2014.
Structural analysis of the concrete building for the evaluation of cracks on structural elements.
Completed 2014.
Structural analysis of the Flow Rider “as-built” condition, structural steel.
Completed 2014.